You want to know when your site goes live. A developer who names a number of weeks straight away without knowing your pages is just guessing. I explain what determines the duration, how a project runs and what you can do to speed it up.

Why do I not name a fixed number of weeks?

Because two sites with the same price can differ a lot in size. A site with a few pages and a contact form is different work from a site with many types of pages, a booking system and an integration with your customer system. What fits your site depends on what you have built and how quickly you supply what is needed.

So ask every developer for a schedule based on the size of your site, with dates by which they need something from you. A developer who promises a date but does not ask what has to go on the site does not know the size yet.

What determines the duration?

Six things determine how long a project runs:

  • The size. The number of pages and the number of types of pages. Ten pages of the same type are less work than ten different ones.
  • Text and images. When they are ready and how good they are. A page without text is not finished, even if the design is in place.
  • Feedback. How quickly you respond, and whether your feedback comes from one person or from several people.
  • Features and integrations. A form is quick to do. A booking system, a webshop or an integration with another system takes more.
  • Decisions. A clear plan goes faster than a plan that changes along the way.
  • Domain and email. Do you have access to your domain name to hand, or does that still have to be found or moved?

How does a project run?

Every project goes through the same phases. They follow one another, although they sometimes overlap.

  • First conversation and plan. What does the site have to do and for whom? With me, every package starts with a tailored marketing strategy. In this phase you fix the size and the schedule.
  • Structure and design. Which pages will there be, what goes on them and what does it look like?
  • Build. The pages and features are built, in my case with your own code.
  • Adding text and images. The content is put on the pages. This is where a project waits most often.
  • Testing and adjusting. On phone and computer, forms, speed and measurement. This is not a step to skip.
  • Launch. The site goes to the real address.
  • After launch. Checking that everything works and what Google does.

What makes it faster or slower?

PartFasterSlower
SizeFew pages of the same typeMany pages with different layouts
Text and imagesReady before the build startsWritten or looked for along the way
FeedbackBundled, in one go, from one personSpread over days and from several people who contradict each other
FeaturesA standard form and a route to contactA booking system, webshop or integration with another system
DecisionsA plan that is ready beforehandChanges after the build has started
Domain and emailAccess to hand, in your own nameMoving the domain or looking for login details

What can you do yourself to speed it up?

  • Have text and images ready before the build starts, even if they are not perfect yet.
  • Appoint one person for feedback, who speaks on behalf of everyone.
  • Bundle your feedback per round instead of sending a small change every day.
  • Decide beforehand what has to go on the site and what can come later. Put the rest on a list for after launch.
  • Make sure you have access to your domain name and your hosting to hand.
  • Collect examples of sites you like and of sites you do not like, with a sentence on why.
  • Plan your own time, because writing text and giving feedback take more hours than you think.

A site is never finished at launch. What you do not need now, you add later.

What still takes time after launch

Some waiting times are outside your developer's control. Plan for them:

  • Google. If your new site replaces an existing one, Google expects several weeks for a small or medium-sized site before most pages have moved. You can read how to keep your place in the piece about redesigning your website.
  • Hosting and DNS. If you move your hosting, Google advises lowering the TTL, the time your DNS records are remembered, a good week before the move. So allow for an extra week.
  • Domain name. If you move your domain name, SIDN says your provider has to give you the transfer token within five days after you ask for it. So request the token before you need it.

When I help you with this

Tell me what you want to have built, and I will say which things decide the duration and what I need from you. For a website with your own code you pay from €1,400 one-off. If you do not want to pay anything upfront, a subscription is an option: from €179 per month, with management and marketing on top and without build costs. All amounts are exclusive of VAT and are explained on Prices. You can read more about the costs of a site in the explanation of what a website costs.

Frequently asked questions

  • What slows a project down most?

    Often waiting for text, images and feedback. Design and build go faster when the content is ready. If you want to save time, start with your text and images, and let the rest follow.

  • Does it go faster if I write the text myself?

    Only if it is ready before the build starts. Writing text often takes more time than you think. Write short and concrete, and let the developer start on that basis. Refining can come afterwards.

  • Is a quickly built website worse?

    It does not have to be. A small site can be finished quickly and work well. It becomes worse when testing and adjusting are skipped. If you are in a hurry, keep the first version small and put the rest on a list for after launch.

  • How long does it take before Google picks up my new site?

    If the new site replaces an existing one, Google names several weeks for a small or medium-sized site. According to Google, a temporary fluctuation in your position is part of it.

  • How long does it take to move a domain name?

    SIDN says that your provider must hand over the transfer token within five days after you ask for it. After that, your new provider requests the move. Your subscription with the old provider may still continue after that.

  • Can I already advertise while the site is being built?

    Better to wait until the pages your ads point to are live. An ad that points to a page that disappears or changes costs you clicks that bring in nothing. A new page then gets a new ad.

  • What happens if I want to change something halfway?

    A small change usually fits within the project. A big one changes the size and therefore the schedule. Extra work outside the agreement costs €80 per hour, excluding VAT, and I agree the number of hours beforehand.

  • How much time does a project cost me myself?

    More than you think, especially at the start and while giving feedback. Count on hours for text, images and looking at the designs. The better prepared you are, the less it costs.

Sources

Where I quote facts from outside, the official source is listed here.

Do you not want to work this out yourself?

Send me a message with what you want to achieve. I tell you what I would do and what it costs. You usually get a reply within 2 hours, from me.

Amounts and what is included are on Prices.